Conwin Carbonics - makers of inflators, regulators and other professional balloon supplies
From: "Designing Parties" <balloons@sanctum.com>
To: "Joe Ponik" <bimages@cwnet.com>, <balloondeco@fooledya.com>
Subject: Re: outside decorations
Date: Fri, 14 Apr 2000 11:26:58 -0400

Greetings from FL
If it were I doing that job I would have all the sculptures done and ready
and loaded into vehicle the evening before.  I would have a motorized
elevating platform ( cherry picker) ready. I would go to the site and have
all my suspension points ready the day before. maybe even practice lifting
and tying the one sculpture.  This would help determine the necessity of
protection  from the plywood. rather than try and hang curtains of the wrong
color I would give thought to standoff to hold the scuplture away from the
wall.  maybe glue foam pads to the sculpture.
I am confused about the time 12pm is that 1 second after 12 noon for a 4
hour duration or 1 second before 12 midnight for a 16 hour requirement.
Balloon sizing would depend on that answer.
Only my thoughts. good luck and let us know how it works out.
Len